Phase 4 - Roofing

Using the tractor to hoist up 4x8 sheets of OSB. The tractor is like having an extra four hands.

Because of the gaps in the roof, sheeting was necessary. This also gives the barn roof more sheer and diagonal strength.

Each side of the roof took a full month, July and August. Two hot months!

Ready to paper and shingle... almost done.

Roofing was actually enjoyable at my pace. Something about being on top of the barn, some 30' high.

 

Back to Photo Gallery